Production of reinforced concrete elements
Equipment
Formwork systems & the equipment for the erection of forms
Graph plotter &
the MPR equipment
Robot for the erection
of formwork & magnets
Magnet boxes &
formwork profiles
Graph plotter & the MPR equipment
For the positioning of the formwork geometry directly onto
the area of its erection.
Advantages:
- reduction in the process time, hence, more efficient usage
of the plant production capacity
- provision for the similar precision & quality of reinforced
concrete elements being produced
- precise, fast,& fault-free drawing of sophisticated
geometries
Structural design:
- traveling mechanisms as bridge & gantry structures
- plants are equipped with separate toothed tires ensuring
maximum travel speed
Technique:
- the formwork geometry is positioned using the jet method
& remains visible for the whole duration of the process
of its erection & a precast product manufacture
- water-thinned & readily removable paint is used for
the geometry positioning
- dynamic servo drives ensure rapid operating speed (as an
average appr. 12 m2/min).
- a control unit serves for communication with computer-aided
design systems or a central production processor in "online"
& "offline" mode
- possibility of combination with the device for the erection
of transversal formwork as well as with the cleaning &
lubricating device (MRP).
Robot for positioning of a form & magnets
For automation of production operations contributing to the
enhancement of profitability as well as quality of manufacture
of precast reinforced concrete elements.
Advantages:
- precision of the formwork positioning in the production
of flat elements of reinforced concrete structures with exact
observance of all dimensions thereof
- production process reliability due to 100-per cent precise
reproduction of the drawing on the formwork surface
- fast formwork erection.
- automation of the warehouse for formwork profiles &
magnets
- longer formwork service life due to the automation of manipulation,
cleaning & lubrication processes
Magnet boxes & formwork profiles
For imparting the preset configuration, dimensions to structures
being concreted, for assuring quality of their surface &
geometry. They accelerate formwork operations providing for
flexibility in the production of a wide frequently variable
range of commodities.
Delivery pattern:
holding
magnets & formwork systems for the production of elements
of double walls & floor slabs
- longitudinal formwork profiles
- transversal formwork profiles for the erection both manually
& be means of a robot
formwork
systems for the production of facade & cast-in-situ elements
- longitudinal & transversal formwork profiles with or
without a joint grouted with cement mortar
- profiles for the production of floor supports
- profiles for wall jointing.
All profiles with the formwork height of up to 400 mm are
produced at the customer request.
Magnets & profiles & erected (removed) both manually
& be means of a cross-piece & by means of a robot
for formwork positioning.
- Flexible formwork & magnet systems
- ML magnet strips offering the improved design & adhering
force of up to 1000 kg.
- MES 18000, a new series of holding magnets, exhibiting high
adhering force & low weight. They are ideally suited for
operation with special wooden or metal formwork profiles.
- Х-Flex hold-down systems in combination with standard magnet
strips. They are suited for settling various problems related
to attachment in concrete work.
- flexible formwork profile for the erection of a semi-circular
geometry, e.g. for the production of balcony slabs
- individual attachment by means of a system of MSM massive
support magnets
|